
The Desert Foothills
Cave Creek & Fountain Hills
Respecting the topography and architectural character of the Valley's rugged high desert communities.
Built into
the Landscape.
No design fee. No in-home sales pitch. Submit a form Monday–Friday before 2 PM Arizona time and we'll call you back the same business day. Otherwise, you'll hear from us the next business day.
Fountain Hills and Cave Creek include hillside settings, desert view properties, and homes influenced by territorial, Southwestern, and contemporary architecture. The relationship between the house and its site often shapes the remodel.
Planning may involve sun and wind exposure, grade changes, exterior access, drainage, and the visual connection to the surrounding land. Those conditions should be checked at the property rather than assumed from the city name alone.
Foothills Considerations
Key focuses when planning a renovation in Cave Creek or Fountain Hills.
Slope & Site Conditions
On a sloped or terraced property, deck changes, retaining walls, drainage, and structural work may require additional site review and engineering. Feasibility should be established before those elements are priced or promised.
Architectural Integration
A cleaner, more modern interior can still respect the timber, masonry, warm textures, or desert materials that give an individual home its identity.
Outdoor Resilience
Exterior finishes, shade structures, and gathering areas should be selected around the property's actual sun, wind, drainage, and maintenance exposure, not appearance alone.
Our Core Disciplines
Planning ranges and timelines
These are standard DYS planning ranges and construction estimates, not quotes or guarantees. Planning, selections, permits and material lead times are separate from construction time, and your written scope and price set the actual numbers for your home.
- Kitchen remodeling
- $20,000 to $120,000
- Construction on site is typically 2 to 4 weeks. Design, selections and ordering come before construction.
- Bathroom remodeling
- $10,000 to $17,000 standard, $17,000 to $25,000 with layout changes, $25,000 to $35,000 for large primary bathrooms
- Construction on site is typically 1 to 3 weeks.
- Whole home renovation
- $60,000 to $800,000, with most projects between $150,000 and $350,000
- Construction is estimated at about 2 months for cosmetic updates, 3 to 5 months with layout changes, and 6 to 8 months for additions and structural work.
Planning questions
Start Your Project
Speak with our team to discuss your goals, explore possibilities, and understand what it takes to transform your home.
No design fee. No in-home sales pitch. Submit a form Monday–Friday before 2 PM Arizona time and we'll call you back the same business day. Otherwise, you'll hear from us the next business day.
Tell us about your project
No design fee. No in-home sales pitch.
