Planning and Budget

What a Bathroom Remodel Costs in Scottsdale (2026)

Three ranges, what each one usually covers, and the decisions that move a bathroom from one range to the next.

By Avi Saslow, DYS Construction AZ · Published · Last updated

Bathroom interior

Owners usually ask for a number before anything else, and that is a fair place to start. A bathroom is small, but it packs plumbing, waterproofing, tile and fixtures into a few square feet, so scope matters far more than size.

This guide explains the three ranges we use and what sits behind each. For the service itself, see bathroom remodeling, or our local page on Scottsdale bathroom remodeling.

The three ranges

$10,000–$17,000 Standard bathroom remodel. New finishes, tile, tub or shower, vanity and fixtures in the same locations. No layout changes and no moving plumbing.

What's typically included

  • New tile for the floor and the tub or shower area
  • Replacement tub or shower
  • New vanity and fixtures
  • Everything stays where it is today

$17,000–$25,000 Upgraded remodel with layout changes. Moving the shower, toilet or vanity, tub to shower conversions, and higher grade materials.

What's typically included

  • Relocated shower, toilet or vanity
  • Tub to shower conversion
  • Higher grade materials
  • Plumbing changes that match the new plan

$25,000–$35,000+ Large primary bathroom, custom and high end. Custom work, a large walk in shower, a freestanding tub, floor to ceiling tile, and new lighting and plumbing layout.

What's typically included

  • Custom work
  • Large walk in shower
  • Freestanding tub
  • Floor to ceiling tile, new lighting and plumbing layout

typical scope, final pricing after design

The first range suits an owner whose layout already works. The tub, vanity and toilet stay where they are, and the money goes into surfaces and fixtures you will see and touch every day. It is often the right choice when the room functions well but looks tired.

The second range fits an owner who wants the room to work differently. Perhaps the tub becomes a shower, or the vanity moves to free up floor space. Because plumbing changes, the job involves more trades, and the materials usually step up as well.

The third range describes a primary bathroom built around custom work. A large walk in shower, a freestanding tub and tile that runs from floor to ceiling call for careful planning of lighting, waterproofing and plumbing together.

These are starting points to help you plan. Your own bathroom may sit between them, and the final number comes only after we see the room and finish the design.

What moves the price

Layout changes and moving plumbing

Keeping the shower, toilet and vanity where they are limits the changes behind the finishes. Once a drain or supply line moves, the floor or wall may need to open, new rough work goes in, and the finished surfaces around it are rebuilt.

Shower size and waterproofing

A larger shower means more tile, more glass and more waterproofing, and the waterproofing is the part you never see again. We treat it as the foundation of the job, because a failure there is expensive to reach later.

Amount and type of tile

Tile choice moves the number in two ways. The material itself varies widely, and so does the labor. Small formats, intricate patterns and floor to ceiling coverage take more hours than a simple field tile on the floor and shower walls.

Vanity and fixtures

Vanities and fixtures range from simple to custom. A single vanity with standard fittings sits differently in the budget than a double vanity with custom storage and upgraded finishes.

Older home surprises behind the walls

Older Scottsdale homes can hide worn plumbing, outdated wiring or water damage that only shows once the room is open. We cannot know until we see it, which is why the written scope explains how any finding is handled before work continues.

Permits when plumbing or electrical moves

When a project moves plumbing or electrical, a City of Scottsdale permit and inspections are typically part of the work. We prepare the submission and arrange the inspections when one is required.

How long a bathroom remodel takes

Construction typically takes 1 to 3 weeks on site. Simpler remodels that keep the same layout are closer to 1 week; layout changes and large primary bathrooms are closer to 3 weeks. Design, selections and ordering happen before construction. We review the construction sequence and expected timing with you before work begins, including periods when the room or water cannot be used. Tile, glass, and vanities have lead times, so we order early.

Our remodeling process page explains how the stages fit together.

How to get an accurate number

The reliable way is a walkthrough. We look at the room, ask how you use it, and talk through what you want changed. The walkthrough is free, and there is no design fee and no in home sales pitch.

You receive a written scope and price before we start. The scope lists what is included and sets allowances for anything not yet chosen, so the number stays honest. If you are also weighing a kitchen, our kitchen remodel cost guide follows the same approach.

Ask every contractor the same questions. What does the price include, what is left as an allowance, and how are changes handled in writing? A clear answer to those three questions tells you more about a quote than the total at the bottom.

Bring photos, a few pictures of bathrooms you like, and any limits on what you want to spend. That helps us suggest which range fits and where a smaller change might get you most of what you want.

Frequently asked questions

How much does a bathroom remodel cost in Scottsdale?

The ranges above are typical scope, with final pricing after design. A standard remodel in the same locations sits in the first range, layout changes in the second, and a large custom primary bathroom in the third.

What makes one bathroom cost more than another?

Mostly scope. Moving plumbing, a larger shower, more tile and custom features add labor and materials, while keeping everything in place keeps a project simpler.

Do you charge for design or the walkthrough?

No. The walkthrough is free, there is no design fee, and there is no in home sales pitch.

How is the price agreed before work begins?

You receive a written scope and price before we start, with allowances for anything not yet selected. Your scope says what is included. A change after that needs your approval first.

Will I need a permit?

Often, when plumbing or electrical moves. We tell you what applies to your scope and handle the permit process when one is required.